BMW X3 (F25) Service & Repair Manual: Final drive mounting

BMW X3 (F25) Service & Repair Manual / Driveline+Axles / Final drive mounting

Replace the rubber mounts for the front of the rear axle final drive suspension

Special tools required:

  • 33 5 200
  • 33 5 206
  • 33 5 166
  • 33 5 163
  • 33 5 162
  • 33 5 161
  • 33 4 466
  • 33 4 465
  • 33 5 105
  • 33 5 164
  • 33 5 165

Necessary preliminary tasks:

  • Remove exhaust system .
  • Remove PROPELLER SHAFT AT FINAL DRIVE .

Position special tool 33 5 200 on workshop jack.

Support rear axle final drive unit with special tool 33 5 200 .

Lash rear axle final drive unit with tightening strap 33 5 206 to special tool 33 5 200 .

IMPORTANT: Tensioning strap 33 5 206 must be pass through between output shafts and rear axle final drive cover!

Driveline+Axles

Release screws (1).

Installation note: Adhere to the installation sequence at the end of the document in order to prevent distortion of the rear axle final drive during installation and thereby avoid potential complaints about noise.

Driveline+Axles

Slacken nut (1).

Only N47: Remove vibration absorber (2) with holder.

Installation note: Replace nut.

Adhere to the installation sequence at the end of the document in order to prevent distortion of the rear axle final drive during installation and thereby avoid potential complaints about noise.

Driveline+Axles

Lower rear axle final drive with special tool 33 5 200 .

Driveline+Axles

Pull out rubber mount with special tools 33 5 166 , 33 5 163 , 33 5 162 , 33 5 161 , 33 4 466 and 33 4 465 .

NOTE: The milled recess of special tool 33 5 162 must point outward toward the rear axle support.

Use ratchet ring spanner 33 5 105 .

Driveline+Axles

IMPORTANT: Coat the bearing bush on the rear axle support and the new rubber mount with Circo Light.

Align rubber mount horizontally by way of slots (1).

Driveline+Axles

Insert rubber mount (1) in special tool 33 5 164 .

Draw in rubber mount (1) with special tools 33 5 165 , 33 5 164 , 33 5 163 , 33 4 466 and 33 4 465 as far as it will go.

NOTE: Use ratchet ring spanner 33 5 105 .

Driveline+Axles

Assembly sequence:

  1. Insert the rear axle final drive into the rear axle support using the workshop jack and special tool 33 5 200 .
  2. Insert screws (1) (do not tighten).
  3. Insert bolt from rear and replace nut (2) (do not tighten down).
  4. Release tensioning strap, lower special tool 33 5 200 and move away.
  5. Tighten down screws (1).
  6. Tighten nut (2).

Driveline+Axles

Replacing the rubber mounts for the rear axle final drive suspension at rear

Special tools required:

  • 33 5 200
  • 33 5 206
  • 33 5 153
  • 33 5 152
  • 33 5 151
  • 33 3 103
  • 33 3 104
  • 33 5 105
  • 33 5 154
  • 33 5 155
  • 33 5 156

Necessary preliminary tasks:

  • Remove exhaust system .
  • Remove PROPELLER SHAFT AT FINAL DRIVE .

Position special tool 33 5 200 on workshop jack. 33 5 200 Support rear axle final drive unit with special tool.

Lash rear axle final drive unit with tightening strap 33 5 206 to special tool 33 5 200 .

IMPORTANT: Tensioning strap 33 5 206 must be pass through between output shafts and rear axle final drive cover!

Driveline+Axles

Release screws (1).

Installation note: Adhere to the installation sequence at the end of the document in order to prevent distortion of the rear axle final drive during installation and thereby avoid potential complaints about noise.

Driveline+Axles

Slacken nut (1).

Only N47: Remove vibration absorber (2) with holder.

Installation note: Replace nut.

Adhere to the installation sequence at the end of the document in order to prevent distortion of the rear axle final drive during installation and thereby avoid potential complaints about noise.

Driveline+Axles

Lower rear axle final drive with special tool 33 5 200 .

Driveline+Axles

Pull out rubber mount with special tools 33 5 153, 33 5 152, 33 5 151, 33 3 103 and 33 3 104 .

NOTE: Ensure that the 33 5 152 special tool is correctly seated on the rear axle support.

Use ratchet ring wrench 33 5 105 .

Driveline+Axles

IMPORTANT: Coat the bearing bush on the rear axle support and the new rubber mount with Circo Light (note BMW Parts Department).

Align rubber mount horizontally by way of elongated hole (1).

Driveline+Axles

Insert rubber mount (1) in special tool 33 5 154.

Draw in rubber mount (1) with special tools 33 5 155, 33 5 154, 33 5 156, 33 3 103 and 33 3 104 as far as it will go.

NOTE: Make sure special tools 33 5 154 and 33 5 156 contact rear axle support correctly.

Use ratchet ring spanner 33 5 105 .

Driveline+Axles

Assembly sequence:

1. Insert the rear axle final drive into the rear axle support using the workshop jack and special tool 33 5 200 .

2. Insert screws (1) (do not tighten).

3. Insert bolt from rear and replace nut (2) (do not tighten down).

4. Release tensioning strap and lower special tool 33 5 200 and move away.

5. Tighten down screws (1).

6. Tighten nut (2).

Driveline+Axles

Final drive with cover
...

Output shafts
...

Other materials:

BMW X3 (F25) Owners Manual > Notes: Event Data Recorder EDR
This vehicle is equipped with an event data recorder EDR. The main purpose of an EDR is to record, in certain crash or near crash-like situations, such as an air bag deployment or hitting a road obstacle, data that will assist in understanding how a vehicle's systems performed. The EDR is de ...